A lift station can be a structure in the future that is filled with pumps, pipes control valves and electrical equipment, but the performance of the structure is controlled earlier. The design of the final lift station is influenced by a number of factors, including flow calculations, elevations on the site, pressures in the system as well as wastewater characteristics, peak circumstances, accessibility to maintenance, control systems, and the capacity to come in the future.

Image credit: romtecutilities.com
For project owners comparing the best lift station designers, the more useful question isn’t simply who can specify pumps. Who is able to translate the site’s conditions into a complete, practical system that is easy to maintain, install, and maintain?
The Limits of Gravity Are a Reality
Gravity is typically the simplest way to move wastewater. But the terrain and construction patterns can make this difficult. It’s possible that new industrial, residential and commercial sites are too far, or too high. They could also be situated in areas where gravity sewer infrastructure expansion isn’t possible.
A lift station will provide the required force mechanically to transfer water from one location in the system of collection to another. However, designing one requires understanding the operation of a typical system as well as less convenient circumstances like a high flow, maintenance of pumps, breakdowns in equipment, or future increases in demands.
The best companies in wastewater design should evaluate the whole issue instead of just treating the station.
Existing Infrastructure Complicates the Puzzle
Construction isn’t always the only challenge. While ensuring the vital infrastructure for wastewater, municipalities often need to upgrade or replace old stations.
Wet wells that are in use, force mains, electrical services, controls, site boundaries, and downstream infrastructure may limit the new design. Engineers must decide which components can be reused as well as what components must be replaced and how the new components will integrate with the existing system.
Romtec Utilities works across municipal commercial, private industrial, retrofit and replacement applications, allowing pumping systems to be developed around the specific needs of the owner and operation of every project.
Stormwater is subject to different rules
The best designers of stromwater systems using the supplied search terminology should solve a unique hydraulic issue. Stormwater systems can experience dramatic changes in volume depending on the amount of rainfall, drainage area, capacities for detention and discharge rates.
For example, a station that serves a detention area could require the temporary holding of the runoff for a while before pumping it out at a specific speed. Engineers need to consider the flow, head conditions, needs for flood management, environmental conditions, and the characteristics of the drainage system that is receiving.
Prefabrication is a way to move work From the Jobsite
Complex field assembly introduces opportunities for problems with scheduling, installation issues as well as change orders and delays. Romtec Utilities performs significant prefabrication of equipment before the project site is constructed.
Incorporating more assembly and quality-control work in a controlled environment can reduce the amount of construction required in the field. Based on Romtec’s plan approach certain projects that otherwise would take weeks to complete can be completed in a matter of days, depending on the situation of the project.
The process of commissioning is an integral part of engineering Success
The installation of all components doesn’t make a station reliable. Romtec Utilities offers installation advisors to assist with construction which includes startup controls, checks on control panels and pump operation, system testing, and training for personnel. Documentation also provides information to operators they can use when repairing the system, or considering the possibility of expansion in the future.
This final stage is important to owners who are looking for the top lift station designs. An excellent engineering design should yield more than an acceptable set of drawings. The station owner must be able to operate a well-functioning system, skilled staff, useful documentation and equipment specifically designed to handle the challenges that the station is expected to face in daily operation.